LPP Graphical Method – 11 – Operations Management – Steel Mine Problem - Videos

0
175

#Operations Research_OR
#Linear Programming
#Graphical Method of solving LPP

Note: Please first watch the lecture “Formulation of LPP – 9 – Operations Management – Work Scheduling” to learn how to formulate the LPP for this managerial problem.

A steel company has two iron mines having different production capacity. The raw iron is classified into three categories High, Medium/Fair and Low according to the quality. The factory of the company requires at least 12 tons of High-grade iron, at least 8 tons of Medium/Fair-grade iron and at least 24 tons of Low-grade iron per week. The daily expenditure of the first mine is ` 20,000 and that of the second mine is ` 16,000. The daily production of raw iron in the two mines is as follows:
Mine Daily production (in tons)
High Medium/Fair Low
I 6 2 4
II 2 2 12
To minimize the cost of transportation, for how many days each mine should work in a week? Formulate this as an LPP and solve the formulated LPP through Graphical Method.

OR, Operations Management, Math, Statistics, OM, Operations Management, Programming, Graphical Method, Mine Problem, Work Scheduling, Minimization, Decision Variables, Objective Function, Constraints, LPP, MBA, MCA, CA, CS, CWA, BBA BCA, BCom, MCom, GRE, GMAT, Grade 11, Grade 12, Class 11, Class 12, IAS, CAIIB, FIII, IBPS, BANK PO, UPSC, CPA, CMA

– www.prashantpuaar.com

source

LEAVE A REPLY

Please enter your comment!
Please enter your name here